Domestic Industry Distribution

Oversea industry distribution
  • Neimenggu

    Inner Mongolia Suanlagou Coal Mine
    Location: Zhungeer in Inner Mongolia
    Reserves: Mining area of 49.8086 square kilometers, reserves of 1.42 billion tons in mine field, recoverable reserves of about 540 million tons.
    Benefits: It is a mine and related coal preparation plant with 12 million tons annual production capacity. Additionally, it owns a more than 20 km long dedicated rail, and its service life is designed to be 34 years. The projects had been completed and commissioned.
  • Shanxi

    Shanxi huoerxinhe coal mine
    Location: Changzhi County, Changzhi City in Shanxi Province
    Reserves: Mining area of 71.39 square kilometers, geological reserves of 545.59 million tons in mine field, recoverable reserves of 236.2 million tons.
    Benefits: It is expected to be completed in 2010. After it reaches the expected capacity, annually coals are 3 million tons.
  • Guizhou

    Guizhou Mayi Coal Mine
    In 2008, Yudean held the 23% shares of Guizhou Mayi Coal Mine through Yueqian Company.
    Location: Pan County, Guizhou Province
    Benefits: An annual output of 2.4 million tons in Phase I project.
    Guizhou Xiangshui Coal Mine
    In 2003, Yudean held the 27% shares of Guizhou Xiangshui Coal Mine through Yueqian Company.
    Location: Pan County, Guizhou Province
    Benefits: Coal output reached 1.3 million tons in 2008. It is expected to reach the expected capacity by 2010, with annual output of 4 million tons.
  • Guangdong

  • Yunnan

    Linchang Yuntou Yudean Hydropower Development Co., Ltd.
    Investment time: March 2005
    Installed capacity: Total installed capacity is 26.8MW (it has been operated completely at the end of 2009).
    Weixin Yuntou Yudean Zhaxi Energy Co., Ltd.
    Installed capacity: Total installed capacity is 4×600MW thermal power generating units. Phase I installed capacity is 2×600MW thermal power generating units and coal mines with corresponding production capability (it was started in November 2009 and expected to operate in September 2011).
    Yunnan Baoshan Binlangjiang Hydropower Development Co., Ltd.
    Investment time: April 2007
    Installed capacity: Total installed capacity is 600MW. It is designed in the development mode of two-reservoir and four-stage (the project is under construction).

Guangdong Province

  • Lianzhou

    Lianzhou Power Plant
    (520MW)
  • Nanshui

    Nanshui Hydro Power Plant
    (75MW)
  • Yangshan

    Yangshan Power Plant
    (185MW)
  • Shaoguan

    Shaoguan Power Plant
    (1016MW)
  • Changhu

    Changhu Hydro Power Plant
    (76MW)
  • Fengshuba

    Fengshuba Power Plant
    (160MW)
  • Changtan

    Changtan Hydro Power Plant
    (60MW)
  • Qingxi

    Qingxi Hydro Power Plant
    (144MW)
  • Penglatan

    Penglatan Hydro Power Plant
    (44MW)
  • Meixian

    Meixian Power Plant
    (520MW)
  • Xinfengjiang

    Xinfengjiang Hydro Power Plant
    (347.5MW)
  • Liuxihe

    Liuxihe Hydro Power Plant
    (50MW)
  • Huangpu

    Huangpu Power Plant
    (1170MW)
  • Luoding

    Luoding Power Plant
    (270MW)
  • Yunfu

    Yunfu Power Plant
    (600MW)
  • Shajiao A

    Shajiao A Power Plant
    (1240MW)
  • Shajiao C

    Shajiao C Power Plant
    (1980MW)
  • Qianwan

    Qianwan LNG Power Plant
    (1170MW)
  • 内蒙西

    Huizhou LNG Power Plant
    (1170MW)
  • Pinghai

    Pinghai Power Plant
    (2000MW)
  • Shanwei

    Shanwei Power Plant
    (1200MW)
  • Huilai

    Huilai Power Plant
    (1200MW)
  • Shibeishan

    Shibeishan Power Plant
    (100.2MW)
  • Taishan

  • Jinwan

    Jinwan Company
    (1200MW)
  • Zhuhai

    Zhuhai Power Plant
    (1400MW)
  • Maoming

    Maoming Thermal Power Plant
    (800MW)
  • Zhanjiang

    Zhanjiang Power Plant
    (1200MW)
  • Zhanjiang Yangqian

    Zhanjiang Yangqian wind power project
    (37.5MW)

    Zhanjiang Yangqian wind power farm
    (12MW)